T&T Stiffeners done
Finished welding them on
here they are
I utilized one of the existing tail light bolts for addition support on the piece that I added
I just need to finish painting the other side, and get the right size hole saw
I got the tire carrier painted, so now it’s completely finished
the start of my new rear crossmember
started working on my rear driveshaft
one side of my frame plating is almost complete
I welded and blended the tail lights today. Once i measure for the holes I will remove them and weld along the joint on the inside for strength (these outside welds are mostly cosmetic)
other side
The second trail we hit this day was Rollins Pass East. It was definitely a nice trail….too bad it cannot be run all the way over the pass any longer.